UK Based Support
Order today, ships tomorrow
#1 Find GPS Cat Tracker with Real-Time Location, Waterproof Design, and Activity Monitoring for Pet Safety and Tracking
Happy Customers
Exclusive Online Discounts
100% Satisfaction Guaranteed
Never Lose Track of Your Cat Again
Imagine the peace of mind that comes from knowing your furry companion is safe, even when they wander off. With the GPS tracker, you can pinpoint your cat’s exact location in seconds — so you're never left wondering where they are.

Safe Zone Alerts: Stay One Step Ahead
Set up a custom "safe zone" using our intuitive mobile app. If your cat strays beyond this area, you'll receive an instant alert — giving you time to act before they wander too far.

Unmatched Battery Life with No Monthly Fees
Unlike other trackers that tie you into costly subscriptions, GPS Cat Tracker offers up to 200 hours of battery life on a single charge — with no ongoing charges. Simply insert a data-enabled SIM card and you’re ready to track.

Designed for Comfort, Built for Adventure
Weighing just 65g and attached to a soft, anti-pull collar, this tracker is comfortable for all cat breeds. The IP68 waterproof rating means it’s ready for the outdoors — rain, puddles, and all.

How It Works
- Insert a nano SIM card (with mobile data) into the tracker.
- Download the mobile app for iOS or Android and pair your device.
- Track your cat in real time, set safety zones, and access their full movement history from your phone.
Specifications
| Weight | 65g |
|---|---|
| Device Size | 65.5 × 37 × 18.3 mm |
| Battery | 500mAh Li-ion | Up to 200 hours |
| Waterproof Rating | IP68 |
| Location Accuracy | GPS: 5–10m | WiFi: 10–20m | LBS: 50–500m |
| Technology | GPS + AGPS + LBS + WiFi |
| Platform | MTK2503D | Quad-band GSM |
| Charging | USB (cable included) |
| Colours | Black, White, Blue, Yellow, Green |
What’s in the Package
- 1x GPS Cat Tracker
- 1x Soft Anti-Yank Collar
- 1x USB Charging Cable
- 1x User Manual
Questions & Answers
Q1: Does it require a subscription?
A1: No. You only need a nano SIM card with mobile data (e.g. EE, O2, Vodafone). No monthly subscription or app fees.
Q2: Will it fit my cat?
A2: Yes. The lightweight tracker is suitable for cats of all sizes and breeds, including older or smaller cats.
Q3: Can I track more than one cat?
A3: Absolutely. The app allows you to pair and monitor multiple devices at once.
Q4: Is the GPS signal accurate?
A4: Yes. The device uses GPS, AGPS, WiFi and LBS triangulation for accurate location tracking both outdoors and indoors.
Q5: What happens if the battery runs low?
A5: You’ll get a notification via the app, giving you plenty of time to recharge before the device switches off.
Q6: Is the app easy to use?
A6: Yes — the app is user-friendly, available in English, and compatible with both Android and iOS. You can track live location, set alerts, check history and more.
Why Pet Owners Choose GPS Cat Tracker
“This device gave me back my peace of mind. I always know where my cat is — and she doesn't even notice she's wearing it.” — Donald R. *Verified UK Customer
Every year, thousands of cats go missing across the UK. With GPS Cat Tracker, you're taking a simple step that could save you days of panic and hours of searching.
Give your cat freedom — and yourself peace of mind.